Selecting a structural contractor is a critical decision when beginning the construction of a villa or residential building. This phase involves executing the fundamental structural elements upon which the building’s stability and load-bearing capacity depend; furthermore, the quality of work during this stage directly influences the ease with which subsequent tasks—such as utility installations and finishing works—can be completed.
And when searching for Structural construction contractor in JeddahThe choice should not be based solely on the price per meter or the total value of the bid. Instead, it is essential to understand the scope of work, material specifications, execution methods, the contractor’s responsibilities, and the procedures for supervision and inspection throughout the project phases.
Construction contracts for the structural shell (skeleton) vary from one project to another; some contractors provide both the labor and the necessary materials, while others limit their role to providing the labor and executing the work using materials supplied by the owner.
In this guide, we explore the scope of structural construction, the difference between contracts that include materials versus those for labor only, the various stages of construction, and how to compare contractor bids and review the contract before beginning the build.
What is meant by bone building?
The term "structural construction" refers to the execution of a building’s primary framework and associated works, in accordance with the approved structural and architectural plans and the scope of the contract.
This type of work typically encompasses the structural elements that form the building’s framework—such as foundations, columns, beams, slabs, and concrete stairs—and may also include masonry work (using bricks or blocks), depending on the agreement.
The importance of this stage lies in establishing the structure upon which the remaining work—such as plumbing, electrical, and HVAC installations, insulation, and finishing—will be carried out.
It is important to note that the term "skeleton" (or "structural shell") does not necessarily imply a standardized scope among all contractors; a contract for one project might encompass all structural work and materials, while another might be limited solely to the construction of the concrete framework.
Therefore, the scope of work must be defined in detail before reaching an agreement with the structural contractor; it is not sufficient to merely state the name of the project phase in the contract.
What work is covered by a structural construction contract?
The work varies depending on the building's design, plans, and agreed-upon specifications; however, the scope of structural construction can be divided into a set of key components.
1. Preliminary works and site preparation
This phase involves preparing the site before the commencement of execution, and—depending on the contract—may include:
- Reviewing approved plans and engineering documents.
- Taking possession of the site and defining the scope of work.
- Preparing storage areas and equipment sites.
- Determining execution locations and reference elevations.
- Preparing the formwork, scaffolding, and necessary equipment.
- Organizing the movement of materials and equipment within the site.
It is necessary to reach an agreement in advance regarding responsibility for site preparation, the provision of temporary electricity and water, and the removal and transport of waste, as these items may not be included in all contractor proposals.
2. Excavation and Foundation Works
Construction work begins with the execution of the foundations, in accordance with the approved structural design and the soil study report.
The work may include:
- Excavation to reach the required levels.
- Preparation of the soil and, where necessary, placement of replacement or fill layers.
- Execution of plain concrete, if included in the design.
- Preparation of reinforcement steel and formwork for the footings.
- Pouring the footings or the raft foundation, depending on the type of foundation.
- Execution of grade beams and elements connected to the foundations.
- Backfilling and compaction in accordance with project requirements.
The dimensions of footings, the amount of reinforcement, and the depth of excavation must not be determined based on personal judgment or models from other projects; rather, these details must be based on the soil report and the approved structural drawings.
3. Execution of columns, beams, and slabs
These works constitute the core part of the building's concrete structure.
They typically include:
- Preparation, cutting, and installation of reinforcing steel.
- Erection of timber or metal formwork.
- Review the locations and dimensions of the columns.
- Construction of concrete beams and bridges.
- Preparing reinforcement steel for slabs.
- Construction of concrete slabs in accordance with the structural system employed.
- Pouring and curing of concrete in accordance with approved specifications.
- Removal of formwork and props in accordance with the appropriate technical and temporal requirements.
This phase requires ongoing coordination between the contractor and the supervising engineer, along with the completion of necessary inspections and approvals prior to the pouring of concrete elements.
4. Masonry and Blockwork
A structural construction contract may include the execution of internal and external walls using concrete blocks or bricks, in accordance with the plans and specifications.
Among the related activities are:
- Construction of external and internal walls.
- Construction of partitions between rooms.
- Determining the locations of door and window openings.
- Checking the straightness and dimensions of the walls.
- Execution of the openings and provisions required for installations.
It is essential to ensure that masonry work is included in the contract—especially when comparing two proposals, where one might include blockwork while the other is limited to the concrete structure.
5. Stairs and other concrete elements
The scope of work may also include the construction of concrete stairs and certain additional elements—such as projections, balconies, and concrete architectural features—depending on the design.
The dimensions, elevations, and locations of the stairs must be reviewed prior to construction, as any discrepancy could affect the stair design and the final finishes.
What is the difference between the cost of materials and the cost of labor in the structural phase of construction?
This is one of the most important questions you should understand before hiring a structural building contractor in Jeddah.
There are two common contracting models:
First: Structural construction (bone structure), including materials and labor.
In this model, the contractor is responsible for providing the necessary materials and executing the work within the scope of the contract.
The materials may include:
- Reinforcing steel.
- Ready-mix concrete.
- The block.
- Materials for formwork and props as per agreement.
- Other implementation requirements.
The contractor’s responsibility entails providing the agreed-upon materials and specifications, and executing the works in accordance with the contract.
Features of this model:
- Reducing the daily burdens associated with purchasing supplies.
- The presence of one party responsible for supplying materials and organizing implementation within the scope of the contract.
- The possibility of establishing a clearer contractual budget when quantities and specifications are defined.
- Reducing the need for the owner to continuously monitor the procurement of materials.
However, it is essential to ensure that the brands, specifications, quantities, and the approval process for materials are defined before they are used.
Second: Construction of the structural skeleton (labor only)
In this model, the owner is responsible for providing the materials, while the contractor is responsible for the labor, execution, equipment, and any services that the parties agree to include in the contract.
The contractor’s scope of work may include:
- Providing workers and technicians.
- Execution of carpentry, steelwork, and concrete works.
- Installation of formwork and props.
- Organization of the execution stages.
- Operation of the equipment covered by the agreement.
Features of this model:
- Greater control for the owner in selecting material suppliers.
- The ability to compare material prices from multiple suppliers.
- Real-time monitoring of purchases and quantities.
- Greater flexibility in selecting material types and their specifications.
However, this model requires greater oversight from the owner or their representative, as any delays in the supply of materials or shortages in quantities could affect the execution schedule.
Comparison between the two models
| Basis of comparison | Materials and workmanship | For labor costs only |
|---|---|---|
| Provision of steel and concrete | The Contractor under the Contract | The owner, most likely |
| Providing blocks | The Contractor under the Contract | The owner, most likely |
| Labor provision | The Contractor | The Contractor |
| Tracking Purchases | Within the scope of the contractor’s agreed-upon responsibilities | The owner bears a larger share of it. |
| Controlling the selection of suppliers | In accordance with the terms of the contract | Greater for the owner |
| Budget monitoring | A more comprehensive, unified view | You need to monitor both the materials and the workmanship. |
| Responsibility for implementation | The contractor, within their scope | The contractor, within their scope |
It is important to clarify that these two models are not independent legal categories with fixed specifications; the distribution of responsibilities may vary depending on the contract. Article 462 of the Saudi Civil Transactions Law stipulates that a contractor may execute the work using materials provided either by themselves or by the employer.
Therefore, the contract must precisely specify who provides each material, who bears the responsibility for its transport, storage, and any wastage, and who is responsible for ensuring it meets the agreed-upon specifications.
What are the stages involved in the structural construction phase?
Structural construction projects require a clear sequence of work, with stages that necessitate engineering inspection being reviewed and approved before proceeding to the next step.
Phase One: Reviewing Plans and Preparation
Before implementation begins, the architectural and structural plans, the soil report, the scope of work, and the bill of quantities are reviewed.
The implementation plan is also agreed upon, the site is prepared, and the responsibilities of each party are defined.
Phase Two: Construction of Foundations
This includes excavation, site preparation, and the construction of foundations in accordance with the approved structural plans and details.
Inspections of excavations, reinforcement, formwork, and any other work requiring engineering approval must be coordinated prior to concrete pouring.
Phase Three: Construction of the Concrete Structure
Once the foundations are completed, work begins on the columns, beams, slabs, and stairs, following the sequence of the building's floors and the structural design.
Each stage requires monitoring the quality of the reinforcement, formwork, concrete, and curing, in accordance with the specifications.
Phase Four: Building Construction
When blockwork is included in the contract, walls, partitions, and openings are to be constructed in accordance with the architectural drawings.
It is necessary to verify the locations of openings and required installations before proceeding with the completion of utility lines and finishing works.
Phase Five: Reviewing the work and completing the items
Once the structural works are completed, the executed work is reviewed and compared against the plans and specifications; any observations are documented and addressed in accordance with technical procedures.
The conclusion of construction or the completion of the structural framework does not automatically mean that the project is ready for finishing work; the tasks and preparations associated with the next phase must first be reviewed.
How do you choose the best structural construction contractor in Jeddah?
Selecting the right contractor does not depend on the lowest bid, but rather on their ability to execute the scope of work to the required quality, while adhering to specifications and the project schedule.
Here are the key criteria that should be reviewed:
1. Verifying the contractor's status and experience
Start by verifying the contractor’s legal credentials and the nature of their business, and ask to review previous projects they have completed in the construction sector.
It is advisable to review projects that are similar to yours in terms of building type, size, and the nature of the operations.
Do not rely solely on the published photographs; instead, try to determine the scope of the contractor’s responsibility for these projects—specifically, whether they handled the entire structural construction (the "skeleton" phase) or only a portion of the work.
2. Reviewing previous projects
Request samples of completed projects, and check:
- Building type and number of floors.
- Scope of the contractor's work.
- The nature of the structural system.
- Site organization level.
- The apparent quality of execution.
- The extent to which agreed-upon deadlines are met.
Reviewing past projects helps you gain a better understanding of a contractor’s working style and practical experience.
3. Ensuring the scope of implementation is clear
اطلب عرضًا يحدد جميع الأعمال المشمولة والمستثناة، ولا تعتمد على عبارة عامة مثل «تنفيذ عظم كامل».
You need to determine whether the offer includes excavation, backfilling, concrete, steel, blocks, stairs, debris removal, and equipment, or if some of these items fall outside its scope.
4. Comparing Price Quotes
Compare contractors' bids based on a standardized bill of quantities and specifications.
A contractor might offer a lower price because they exclude certain tasks or use different specifications, whereas another proposal may include additional materials and work.
Most importantly, compare the scope itself before passing judgment on the price.
5. Knowing how to monitor implementation
Inquire about site organization, responsibility for supervising the workforce, the mechanism for submitting progress reports, and coordination with the supervising engineering firm.
The project requires continuous communication between the owner, the contractor, and the supervising engineer, especially when pouring concrete elements or when additional work arises.
6. Reviewing the timeline
Request a schedule that outlines the implementation phases and the estimated duration for each phase, while specifying which tasks are dependent on the availability of materials or on approvals and inspections by the supervisory authority.
A mechanism should also be established for handling delays resulting from site conditions, late deliveries, or modifications requested by the owner.
What should a contract for a structural construction (shell-and-core) contractor include?
A contract is one of the most important tools for regulating the relationship between an owner and a contractor; it should not be limited solely to the execution cost or the price per meter.
It is best to include the following items:
| Item | Required details |
|---|---|
| Scope of Work | Defining all stages and structural (skeleton/shell) works included |
| Plans | Identifying the authorized versions and any subsequent amendments |
| Bill of Quantities | Quantities, Specifications, and Measurement Methodology |
| Materials | Identifying the entity responsible for providing each item |
| Material Specifications | Types of steel, concrete, and blocks, and the required specifications |
| Labor and Equipment | Defining the contractor's responsibility for providing them |
| Implementation duration | Start date, phases, and expected duration |
| Payments | The value of payments and their linkage to the completion of specific milestones |
| Examinations | Tests and approvals required before and after implementation |
| Supervision | Defining the relationship with the supervising engineering firm |
| Additional Works | The mechanism for its approval and the determination of its cost prior to implementation |
| Guarantees | Defining the obligations, guarantees, and coverages applicable to the project |
| Receipt | Mechanism for inspecting work, documenting observations, and addressing them |
It is advisable to review the standard contracts referenced by the Ministry of Municipalities and Housing—made available through the Saudi Contractors Authority—and to seek professional assistance whenever it is necessary to review contractual terms.
What is the role of the supervising engineering firm during the structural construction phase?
A distinction must be made between the role of the contractor and the role of the supervising engineering firm.
The contractor is responsible for executing the works and providing the necessary materials, labor, and equipment in accordance with the contract, while the supervising engineering firm is responsible for monitoring the works and verifying their compliance with the plans and specifications, as per the agreed-upon scope of supervision and responsibilities.
Among the most important aspects of engineering monitoring are:
- Reviewing the work prior to casting concrete elements.
- Verification of reinforcement and formwork in accordance with the drawings.
- Monitoring the results of concrete and materials testing.
- Reviewing technical notes during implementation.
- Following up on corrective actions when necessary.
- Documenting the implementation stages and the required reports.
As part of the procedures for issuing a building permit, the Ministry of Municipalities and Housing emphasizes the importance of contracting with a supervising engineering firm and a construction contractor, in addition to fulfilling the requirements for the permit, insurance, and other relevant documentation.
Therefore, the contractor should not be considered a substitute for independent engineering supervision when project procedures require such supervision.
How is the quality of structural (skeleton) construction work monitored?
The quality of structural work depends on adherence to plans, specifications, and inspection and testing procedures, rather than solely on the final appearance of the concrete.
Among the most prominent aspects of quality control are:
Concrete quality: Reviewing concrete specifications and test results, and ensuring adherence to pouring and curing procedures.
Reinforcing steel: Verify the type, diameters, quantities, distribution, lengths, and details in accordance with the approved drawings.
Formwork and props: Verifying its stability and preparing it in accordance with execution and safety requirements.
Dimensions and elevations: Review the locations, dimensions, and elevations of structural elements.
Documentation: Retaining test results, inspection reports, and the supervising engineer’s notes.
The Saudi Building Code (SBC 302) provides requirements related to the execution of concrete structures, temporary construction structures, and the inspection and testing of materials, while the Saudi Building Code for Concrete Structures (SBC 304) specifies requirements for structural design, concrete elements, and reinforcement specifications.
You may refer to:
What mistakes should be avoided when hiring a structural contractor?
There are common mistakes that can lead to disputes, additional costs, or project delays; among the most notable are:
- Contracting based solely on price: Without comparing the specifications and scope of work.
- Failure to specify materials: Especially in structural-only contracts that include both materials and labor.
- Absence of a bill of quantities: Which makes comparing the offers difficult.
- Failure to define responsibility for waste and procurement: Especially when contracting for labor only.
- Ignoring the role of the supervising office: And relying solely on monitoring the contractor.
- Changing plans during execution without approval: Which may lead to errors or structural conflicts.
- Paying large sums without linking them to achievement: Which reduces the owner's ability to monitor obligations.
- Failure to document additional work: And relying on verbal agreements.
- Delay in addressing feedback: Until problems accumulate and affect subsequent stages.
It is best to structure the contractual relationship from the outset, defining the methods for communication, the approval of work, and the handling of changes before execution begins.
Why choose Elite Houses to carry out your project?
Elite Houses operates in the fields of contracting, construction, and the execution of residential and commercial projects, offering services that include building, finishing, maintenance, and renovation.
Every project requires the definition of its implementation scope, specifications, timeline, and responsibilities prior to contracting; this helps in organizing the work and monitoring it throughout the project phases.
The company’s areas of operation include:
- Residential and commercial project execution.
- Construction and building works within the scope of the agreed-upon projects.
- Interior and exterior finishing.
- Maintenance and restoration services.
- Engineering services offered within the scope of the company’s services.
And you can learn about Elite Houses Services and reviewing The company’s published projects To gain an understanding of the nature of residential and commercial projects and developments.
If you are planning to build a villa or a building in Jeddah, you can Contact the Elite Houses team To discuss project requirements and the required scope of work.
Frequently Asked Questions About Structural Construction Contractors in Jeddah
What is meant by a "structural construction contractor"?
This is the contractor responsible for executing the primary structural works of a building—such as foundations, columns, beams, slabs, and stairs—which may also include masonry work, depending on the scope of the contract.
What is the difference between the cost of materials and the cost of labor in the structural phase of construction?
In the construction of a building's structural shell—whether based on an agreement for "materials and labor" or "labor only"—the responsibilities differ: in the former, the contractor provides the materials and carries out the work, while in the latter, the owner supplies the materials, and the contractor provides the labor and execution as per the agreement. All responsibilities must be defined in detail within the contract.
Does a "skeleton construction" contract include blockwork?
Not necessarily. A structural construction contract may include both the concrete framework and the masonry (blockwork), whereas some contracts are limited to concrete elements only. Therefore, the scope of work and the bill of quantities should be reviewed before signing.
How do I compare offers from structural contractors?
Compare the bids based on plans, quantities, specifications, materials, labor, equipment, duration of execution, and excluded work—not just the total price.
Does the structural construction phase of a villa require a supervising engineering firm?
The procedures for issuing a building permit in the Kingdom require contracting with a supervising engineering firm and a construction contractor, in accordance with the requirements set out by the Ministry of Municipalities and Housing. Engineering supervision also assists in monitoring the construction process and verifying compliance with the approved plans and specifications.
How can I tell if the quality of the structural work is adequate?
This is achieved by reviewing plans, specifications, material test reports, and inspection and supervision records, as well as by examining the work during construction. The external appearance of a structure alone cannot be relied upon to judge its safety.
Can the structural contractor also carry out the finishing work?
Yes, some companies may offer a comprehensive scope that includes both structural work and finishing; however, this depends on the specific services provided by the company and the terms of the contract. The scope and responsibilities for each phase must be clearly defined separately before entering into an agreement.
What is the most important thing to verify before signing a structural construction contract?
The most important items to review are the scope of work, approved drawings, specifications, bill of quantities, materials, project duration, payments, testing procedures, the mechanism for addressing comments, and additional works.
Conclusion
Selecting a structural construction contractor in Jeddah requires both a technical and commercial assessment before signing a contract; price alone does not determine the quality of a bid or its suitability for the project.
Begin by reviewing the contractor’s experience and past projects; then, compare the scope of work, materials, and specifications. Ensure there is a clear distinction between a contract that includes both materials and labor versus one that covers only labor, and explicitly define—in writing—the responsibilities for execution, supervision, payment terms, and the project schedule.
Furthermore, having approved plans, appropriate engineering supervision, and continuous monitoring of construction quality helps organize the project and minimize issues that might arise in later stages.
If you are preparing to build a villa or a new structure in Jeddah, selecting the right contractor and defining the scope of work from the outset are essential foundations for the success of the structural phase and the completion of the project.